Skip to contentBuilds for mail
Status
-
- The last build was successful.
-
- The last build was successful. A new build is in progress.
-
- The last build was successful but unstable. This is primarily used to represent test failures.
-
- The last build was successful but unstable. A new build is in progress.
-
- The last build failed.
-
- The last build failed. A new build is in progress.
-
- The project has never been built.
-
- The first build is in progress.
-
- The last build was aborted.
-
- The last build was aborted. A new build is in progress.
-
- The project is disabled.
-
- The project is disabled, but a build is in progress.
Project Health
-
- Project health is over 80%
-
- Project health is over 60% and up to 80%
-
- Project health is over 40% and up to 60%
-
- Project health is over 20% and up to 40%
-
- Project health is 20% or less